West Queue Project 24-253 — Battery in Clackamas, Oregon
West Queue Project 24-253 — Battery in Clackamas, Oregon is a 200.0 MW battery interconnection project in Clackamas, Oregon with a current status of withdrawn. It is proposed to connect at Rosemont 115kV Substation.
200.0 MWCapacity
WithdrawnStatus
WestMarket
BatteryTechnology
Project facts
| Canonical name | West Queue Project 24-253 — Battery in Clackamas, Oregon |
|---|---|
| Queue ID | 24-253 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | West |
| Technology | Battery |
| Capacity | 200.0 MW |
| State | Oregon |
| County | Clackamas |
| Point of interconnection | Rosemont 115kV Substation |
| Requested (queue) date | 2024-05-24 |
| Proposed in-service date | 2027-12-31 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Portland General Electric |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata