West Queue Project 248 — Hydro in Deschutes, Oregon

West Queue Project 248 — Hydro in Deschutes, Oregon is a 5.0 MW hydro interconnection project in Deschutes, Oregon with a current status of operational. It is proposed to connect at Tumalo Line (Bend - Redmond) south of Deschutes substation..

5.0 MWCapacity
OperationalStatus
WestMarket
HydroTechnology

Project facts

Canonical nameWest Queue Project 248 — Hydro in Deschutes, Oregon
Queue ID248
Statusoperational
Source statusoperational
MarketWest
TechnologyHydro
Capacity5.0 MW
StateOregon
CountyDeschutes
Point of interconnectionTumalo Line (Bend - Redmond) south of Deschutes substation.
Requested (queue) date2008-11-14
Proposed in-service date2010-10-11
Operational date
Withdrawn date
DeveloperCentral Oregon Irrigation District
Utility / transmission ownerPacifiCorp

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata