West Queue Project 25-041825 — Solar in Larimer, Colorado

West Queue Project 25-041825 — Solar in Larimer, Colorado is a 50.0 MW solar interconnection project in Larimer, Colorado with a current status of active. It is proposed to connect at Rawhide 34.5kV.

50.0 MWCapacity
ActiveStatus
WestMarket
SolarTechnology

Project facts

Canonical nameWest Queue Project 25-041825 — Solar in Larimer, Colorado
Queue ID25-041825
Statusactive
Source statusactive
MarketWest
TechnologySolar
Capacity50.0 MW
StateColorado
CountyLarimer
Point of interconnectionRawhide 34.5kV
Requested (queue) date2025-04-18
Proposed in-service date2028-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerPlatte River Power Authority

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata