West Queue Project 327 — Other in Douglas, Oregon

West Queue Project 327 — Other in Douglas, Oregon is a 20.0 MW other interconnection project in Douglas, Oregon with a current status of withdrawn. It is proposed to connect at substation located at the existing generation facility.

20.0 MWCapacity
WithdrawnStatus
WestMarket
OtherTechnology

Project facts

Canonical nameWest Queue Project 327 — Other in Douglas, Oregon
Queue ID327
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologyOther
Capacity20.0 MW
StateOregon
CountyDouglas
Point of interconnectionsubstation located at the existing generation facility
Requested (queue) date2010-03-22
Proposed in-service date2012-06-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerPacifiCorp

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata