West Queue Project 332 — Other in Beaver, Utah

West Queue Project 332 — Other in Beaver, Utah is a 2.8 MW other interconnection project in Beaver, Utah with a current status of withdrawn. It is proposed to connect at Circuit SML21, out of South Milford substation.

2.8 MWCapacity
WithdrawnStatus
WestMarket
OtherTechnology

Project facts

Canonical nameWest Queue Project 332 — Other in Beaver, Utah
Queue ID332
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologyOther
Capacity2.8 MW
StateUtah
CountyBeaver
Point of interconnectionCircuit SML21, out of South Milford substation
Requested (queue) date2010-04-29
Proposed in-service date2011-06-01
Operational date
Withdrawn date
DeveloperPacifiCorp
Utility / transmission ownerPacifiCorp

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata