West Queue Project 337 — Hydro in Washington, Utah
West Queue Project 337 — Hydro in Washington, Utah is a 174.0 MW hydro interconnection project in Washington, Utah with a current status of withdrawn. It is proposed to connect at Hurricane West substation.
174.0 MWCapacity
WithdrawnStatus
WestMarket
HydroTechnology
Project facts
| Canonical name | West Queue Project 337 — Hydro in Washington, Utah |
|---|---|
| Queue ID | 337 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | West |
| Technology | Hydro |
| Capacity | 174.0 MW |
| State | Utah |
| County | Washington |
| Point of interconnection | Hurricane West substation |
| Requested (queue) date | 2010-06-03 |
| Proposed in-service date | 2005-07-12 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | PacifiCorp |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.