West Queue Project 340 — Hydro in Washington, Utah

West Queue Project 340 — Hydro in Washington, Utah is a 5.2 MW hydro interconnection project in Washington, Utah with a current status of withdrawn. It is proposed to connect at Section 10, T425, R13W.

5.2 MWCapacity
WithdrawnStatus
WestMarket
HydroTechnology

Project facts

Canonical nameWest Queue Project 340 — Hydro in Washington, Utah
Queue ID340
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologyHydro
Capacity5.2 MW
StateUtah
CountyWashington
Point of interconnectionSection 10, T425, R13W
Requested (queue) date2010-06-03
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerPacifiCorp

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.