West Queue Project 342 — Solar in Beaverhead, Montana

West Queue Project 342 — Solar in Beaverhead, Montana is a 240.0 MW solar interconnection project in Beaverhead, Montana with a current status of withdrawn. It is proposed to connect at Anaconda Mill Creek -- Peterson Flats 230kV.

240.0 MWCapacity
WithdrawnStatus
WestMarket
SolarTechnology

Project facts

Canonical nameWest Queue Project 342 — Solar in Beaverhead, Montana
Queue ID342
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologySolar
Capacity240.0 MW
StateMontana
CountyBeaverhead
Point of interconnectionAnaconda Mill Creek -- Peterson Flats 230kV
Requested (queue) date2018-06-06
Proposed in-service date2020-12-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerNorthWestern Energy

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata