Beaverhead County, Montana — Interconnection Projects

The interXdata warehouse tracks 8 interconnection projects in Beaverhead, Montana, representing 1,089 MW of requested capacity.

8Total projects
2Active
2Operational
4Withdrawn
1,089 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Solar3520 MW
Solar+Battery2360 MW
Battery1200 MW
Hydro29 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
West Queue Project 342 — Solar in Beaverhead, Montana342Solar240.0 MWwithdrawnBeaverhead, Montana
Anthelope Hills Solar Generation BESS68315_ARFL2Battery200.0 MWactiveBeaverhead, Montana
West Queue Project 368 — Solar+Battery in Beaverhead, Montana368Solar+Battery200.0 MWwithdrawnBeaverhead, Montana
Anthelope Hills Solar Generation BESS68315_ARFL1Solar200.0 MWactiveBeaverhead, Montana
West Queue Project 341 — Solar+Battery in Beaverhead, Montana341Solar+Battery160.0 MWoperationalBeaverhead, Montana
Apex Solar64189_RSNAKSolar80.0 MWoperationalBeaverhead, Montana
West Queue Project 123 — Hydro in Beaverhead, Montana123Hydro4.7 MWwithdrawnBeaverhead, Montana
West Queue Project 367 — Hydro in Beaverhead, Montana367Hydro4.7 MWwithdrawnBeaverhead, Montana

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.