West Queue Project 343 — Wind in Morrow, Oregon

West Queue Project 343 — Wind in Morrow, Oregon is a 600.0 MW wind interconnection project in Morrow, Oregon with a current status of withdrawn. It is proposed to connect at 500kV.

600.0 MWCapacity
WithdrawnStatus
WestMarket
WindTechnology

Project facts

Canonical nameWest Queue Project 343 — Wind in Morrow, Oregon
Queue ID343
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologyWind
Capacity600.0 MW
StateOregon
CountyMorrow
Point of interconnection500kV
Requested (queue) date2010-07-16
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerIdaho Power Company

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata