West Queue Project 349 — Other in Multnomah, Oregon

West Queue Project 349 — Other in Multnomah, Oregon is a 8.6 MW other interconnection project in Multnomah, Oregon with a current status of withdrawn. It is proposed to connect at Circuit, 5P123, out of Killingsworth substation.

8.6 MWCapacity
WithdrawnStatus
WestMarket
OtherTechnology

Project facts

Canonical nameWest Queue Project 349 — Other in Multnomah, Oregon
Queue ID349
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologyOther
Capacity8.6 MW
StateOregon
CountyMultnomah
Point of interconnectionCircuit, 5P123, out of Killingsworth substation
Requested (queue) date2010-08-13
Proposed in-service date2011-12-31
Operational date
Withdrawn date
DeveloperKlamath Falls Bioenergy, LLC
Utility / transmission ownerPacifiCorp

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata