West Queue Project 389-A — Solar in Lake, Oregon

West Queue Project 389-A — Solar in Lake, Oregon is a 2.0 MW solar interconnection project in Lake, Oregon with a current status of operational. It is proposed to connect at Circuit 5L105 out of Mile Hi substation.

2.0 MWCapacity
OperationalStatus
WestMarket
SolarTechnology

Project facts

Canonical nameWest Queue Project 389-A — Solar in Lake, Oregon
Queue ID389-A
Statusoperational
Source statusoperational
MarketWest
TechnologySolar
Capacity2.0 MW
StateOregon
CountyLake
Point of interconnectionCircuit 5L105 out of Mile Hi substation
Requested (queue) date2011-05-20
Proposed in-service date2012-07-01
Operational date
Withdrawn date
DeveloperBC Solar, LLC
Utility / transmission ownerPacifiCorp

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.