West Queue Project 393 — Geothermal in Lake, Oregon

West Queue Project 393 — Geothermal in Lake, Oregon is a 27.0 MW geothermal interconnection project in Lake, Oregon with a current status of withdrawn. It is proposed to connect at Mile-Hi substation.

27.0 MWCapacity
WithdrawnStatus
WestMarket
GeothermalTechnology

Project facts

Canonical nameWest Queue Project 393 — Geothermal in Lake, Oregon
Queue ID393
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologyGeothermal
Capacity27.0 MW
StateOregon
CountyLake
Point of interconnectionMile-Hi substation
Requested (queue) date2011-07-05
Proposed in-service date
Operational date
Withdrawn date2017-06-05
Developer
Utility / transmission ownerPacifiCorp

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata