West Queue Project 402 — Wind in Baker, Oregon

West Queue Project 402 — Wind in Baker, Oregon is a 10.0 MW wind interconnection project in Baker, Oregon with a current status of operational. It is proposed to connect at 138 kV.

10.0 MWCapacity
OperationalStatus
WestMarket
WindTechnology

Project facts

Canonical nameWest Queue Project 402 — Wind in Baker, Oregon
Queue ID402
Statusoperational
Source statusoperational
MarketWest
TechnologyWind
Capacity10.0 MW
StateOregon
CountyBaker
Point of interconnection138 kV
Requested (queue) date2012-12-13
Proposed in-service date2017-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerIdaho Power Company

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata