West Queue Project 414 — Gas in Beadle, South Dakota

West Queue Project 414 — Gas in Beadle, South Dakota is a 2.2 MW gas interconnection project in Beadle, South Dakota with a current status of operational. It is proposed to connect at Existing Huron Generating Substation.

2.2 MWCapacity
OperationalStatus
WestMarket
GasTechnology

Project facts

Canonical nameWest Queue Project 414 — Gas in Beadle, South Dakota
Queue ID414
Statusoperational
Source statusoperational
MarketWest
TechnologyGas
Capacity2.2 MW
StateSouth Dakota
CountyBeadle
Point of interconnectionExisting Huron Generating Substation
Requested (queue) date2021-08-20
Proposed in-service date2021-12-01
Operational date2021-12-01
Withdrawn date
Developer
Utility / transmission ownerNorthWestern Energy

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata