West Queue Project 493 — Solar in Beaver, Utah
West Queue Project 493 — Solar in Beaver, Utah is a 3.0 MW solar interconnection project in Beaver, Utah with a current status of operational. It is proposed to connect at Circuit SML11 out of South Milford substation.
3.0 MWCapacity
OperationalStatus
WestMarket
SolarTechnology
Project facts
| Canonical name | West Queue Project 493 — Solar in Beaver, Utah |
|---|---|
| Queue ID | 493 |
| Status | operational |
| Source status | operational |
| Market | West |
| Technology | Solar |
| Capacity | 3.0 MW |
| State | Utah |
| County | Beaver |
| Point of interconnection | Circuit SML11 out of South Milford substation |
| Requested (queue) date | 2013-03-19 |
| Proposed in-service date | 2015-09-30 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Milford Flat Solar, LLC |
| Utility / transmission owner | PacifiCorp |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata