West Queue Project 499 — Solar in Malheur, Oregon

West Queue Project 499 — Solar in Malheur, Oregon is a 4.4 MW solar interconnection project in Malheur, Oregon with a current status of withdrawn. It is proposed to connect at VALE 12.47kV Feeder.

4.4 MWCapacity
WithdrawnStatus
WestMarket
SolarTechnology

Project facts

Canonical nameWest Queue Project 499 — Solar in Malheur, Oregon
Queue ID499
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologySolar
Capacity4.4 MW
StateOregon
CountyMalheur
Point of interconnectionVALE 12.47kV Feeder
Requested (queue) date2015-05-15
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerIdaho Power Company

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata