West Queue Project 513 — Solar in Iron, Utah

West Queue Project 513 — Solar in Iron, Utah is a 80.0 MW solar interconnection project in Iron, Utah with a current status of operational. It is proposed to connect at Three Peaks substation.

80.0 MWCapacity
OperationalStatus
WestMarket
SolarTechnology

Project facts

Canonical nameWest Queue Project 513 — Solar in Iron, Utah
Queue ID513
Statusoperational
Source statusoperational
MarketWest
TechnologySolar
Capacity80.0 MW
StateUtah
CountyIron
Point of interconnectionThree Peaks substation
Requested (queue) date2013-09-10
Proposed in-service date2016-08-30
Operational date
Withdrawn date
DeveloperIron Springs Solar, LLC
Utility / transmission ownerPacifiCorp

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.