West Queue Project 52 — Other in Salt Lake, Utah

West Queue Project 52 — Other in Salt Lake, Utah is a 3.2 MW other interconnection project in Salt Lake, Utah with a current status of operational. It is proposed to connect at Terminal substation distribution circuit.

3.2 MWCapacity
OperationalStatus
WestMarket
OtherTechnology

Project facts

Canonical nameWest Queue Project 52 — Other in Salt Lake, Utah
Queue ID52
Statusoperational
Source statusoperational
MarketWest
TechnologyOther
Capacity3.2 MW
StateUtah
CountySalt Lake
Point of interconnectionTerminal substation distribution circuit
Requested (queue) date2005-03-28
Proposed in-service date2006-07-20
Operational date
Withdrawn date
DeveloperSalt Lake Energy Systems, LLC
Utility / transmission ownerPacifiCorp

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.