West Queue Project 58 — Geothermal in Beaver, Utah

West Queue Project 58 — Geothermal in Beaver, Utah is a 38.0 MW geothermal interconnection project in Beaver, Utah with a current status of withdrawn. It is proposed to connect at Sevier - Cameron Line (near Mother Earth substation).

38.0 MWCapacity
WithdrawnStatus
WestMarket
GeothermalTechnology

Project facts

Canonical nameWest Queue Project 58 — Geothermal in Beaver, Utah
Queue ID58
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologyGeothermal
Capacity38.0 MW
StateUtah
CountyBeaver
Point of interconnectionSevier - Cameron Line (near Mother Earth substation)
Requested (queue) date2005-08-11
Proposed in-service date2007-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerPacifiCorp

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata