West Queue Project 586 — Solar in Umatilla, Oregon

West Queue Project 586 — Solar in Umatilla, Oregon is a 6.0 MW solar interconnection project in Umatilla, Oregon with a current status of operational. It is proposed to connect at Circuit 5W201, State Hospital, out of Buckaroo substation.

6.0 MWCapacity
OperationalStatus
WestMarket
SolarTechnology

Project facts

Canonical nameWest Queue Project 586 — Solar in Umatilla, Oregon
Queue ID586
Statusoperational
Source statusoperational
MarketWest
TechnologySolar
Capacity6.0 MW
StateOregon
CountyUmatilla
Point of interconnectionCircuit 5W201, State Hospital, out of Buckaroo substation
Requested (queue) date2014-07-02
Proposed in-service date2018-07-31
Operational date
Withdrawn date
DeveloperNorWest Energy 12, LLC
Utility / transmission ownerPacifiCorp

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata