West Queue Project 595 — Solar in Millard, Utah

West Queue Project 595 — Solar in Millard, Utah is a 20.0 MW solar interconnection project in Millard, Utah with a current status of withdrawn. It is proposed to connect at Delta Clear Lake 69 kV line.

20.0 MWCapacity
WithdrawnStatus
WestMarket
SolarTechnology

Project facts

Canonical nameWest Queue Project 595 — Solar in Millard, Utah
Queue ID595
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologySolar
Capacity20.0 MW
StateUtah
CountyMillard
Point of interconnectionDelta Clear Lake 69 kV line
Requested (queue) date2014-07-09
Proposed in-service date2016-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerPacifiCorp

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata