West Queue Project 60 — Solar+Battery in Asotin, Washington is a 150.0 MW solar+battery interconnection project in Asotin, Washington with a current status of suspended. It is proposed to connect at Dry Creek 230 kV station.

150.0 MWCapacity
SuspendedStatus
WestMarket
Solar+BatteryTechnology

Project facts

Canonical nameWest Queue Project 60 — Solar+Battery in Asotin, Washington
Queue ID60
Statussuspended
Source statussuspended
MarketWest
TechnologySolar+Battery
Capacity150.0 MW
StateWashington
CountyAsotin
Point of interconnectionDry Creek 230 kV station
Requested (queue) date2018-06-04
Proposed in-service date2025-09-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerAvista Utilities

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.