West Queue Project 614 — Wind in San Juan, Utah

West Queue Project 614 — Wind in San Juan, Utah is a 199.2 MW wind interconnection project in San Juan, Utah with a current status of withdrawn. It is proposed to connect at Moab-Pinto 138 kV line at or around Pole #385.

199.2 MWCapacity
WithdrawnStatus
WestMarket
WindTechnology

Project facts

Canonical nameWest Queue Project 614 — Wind in San Juan, Utah
Queue ID614
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologyWind
Capacity199.2 MW
StateUtah
CountySan Juan
Point of interconnectionMoab-Pinto 138 kV line at or around Pole #385
Requested (queue) date2014-08-25
Proposed in-service date2016-11-30
Operational date
Withdrawn date
Developer
Utility / transmission ownerPacifiCorp

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata