West Queue Project 765 — Solar in Iron, Utah

West Queue Project 765 — Solar in Iron, Utah is a 240.0 MW solar interconnection project in Iron, Utah with a current status of withdrawn. It is proposed to connect at Holt substation.

240.0 MWCapacity
WithdrawnStatus
WestMarket
SolarTechnology

Project facts

Canonical nameWest Queue Project 765 — Solar in Iron, Utah
Queue ID765
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologySolar
Capacity240.0 MW
StateUtah
CountyIron
Point of interconnectionHolt substation
Requested (queue) date2016-06-22
Proposed in-service date2019-12-19
Operational date
Withdrawn date
Developer
Utility / transmission ownerPacifiCorp

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata