West Queue Project 789 — Solar+Battery in Fremont, Wyoming

West Queue Project 789 — Solar+Battery in Fremont, Wyoming is a 74.9 MW solar+battery interconnection project in Fremont, Wyoming with a current status of active. It is proposed to connect at Riverton-Thermopolis transmission line.

74.9 MWCapacity
ActiveStatus
WestMarket
Solar+BatteryTechnology

Project facts

Canonical nameWest Queue Project 789 — Solar+Battery in Fremont, Wyoming
Queue ID789
Statusactive
Source statusactive
MarketWest
TechnologySolar+Battery
Capacity74.9 MW
StateWyoming
CountyFremont
Point of interconnectionRiverton-Thermopolis transmission line
Requested (queue) date2016-08-08
Proposed in-service date2026-12-15
Operational date
Withdrawn date
DeveloperFresh Air Energy II, LLC
Utility / transmission ownerPacifiCorp

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.