West Queue Project 792 — Solar+Battery in Carbon, Utah

West Queue Project 792 — Solar+Battery in Carbon, Utah is a 80.0 MW solar+battery interconnection project in Carbon, Utah with a current status of active. It is proposed to connect at Mathington substation.

80.0 MWCapacity
ActiveStatus
WestMarket
Solar+BatteryTechnology

Project facts

Canonical nameWest Queue Project 792 — Solar+Battery in Carbon, Utah
Queue ID792
Statusactive
Source statusactive
MarketWest
TechnologySolar+Battery
Capacity80.0 MW
StateUtah
CountyCarbon
Point of interconnectionMathington substation
Requested (queue) date2016-09-01
Proposed in-service date2025-12-31
Operational date
Withdrawn date
DeveloperRC Solar Energy LLC
Utility / transmission ownerPacifiCorp

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.