West Queue Project 838 — Solar+Battery in Utah, Utah
West Queue Project 838 — Solar+Battery in Utah, Utah is a 525.0 MW solar+battery interconnection project in Utah, Utah with a current status of active. It is proposed to connect at Clover-Oquirrh transmission line.
525.0 MWCapacity
ActiveStatus
WestMarket
Solar+BatteryTechnology
Project facts
| Canonical name | West Queue Project 838 — Solar+Battery in Utah, Utah |
|---|---|
| Queue ID | 838 |
| Status | active |
| Source status | active |
| Market | West |
| Technology | Solar+Battery |
| Capacity | 525.0 MW |
| State | Utah |
| County | Utah |
| Point of interconnection | Clover-Oquirrh transmission line |
| Requested (queue) date | 2016-12-08 |
| Proposed in-service date | 2025-09-15 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Faraday Interconnection LLC |
| Utility / transmission owner | PacifiCorp |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata