West Queue Project 867 — Wind in Carbon, Utah

West Queue Project 867 — Wind in Carbon, Utah is a 80.0 MW wind interconnection project in Carbon, Utah with a current status of withdrawn. It is proposed to connect at Soldier Summit-Clear Creek line OR Rains substation.

80.0 MWCapacity
WithdrawnStatus
WestMarket
WindTechnology

Project facts

Canonical nameWest Queue Project 867 — Wind in Carbon, Utah
Queue ID867
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologyWind
Capacity80.0 MW
StateUtah
CountyCarbon
Point of interconnectionSoldier Summit-Clear Creek line OR Rains substation
Requested (queue) date2017-04-24
Proposed in-service date2019-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerPacifiCorp

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.