West Queue Project 893 — Hydro in Jefferson, Oregon is a 1.1 MW hydro interconnection project in Jefferson, Oregon with a current status of withdrawn. It is proposed to connect at Circuit 5D5 out of Culver substation.

1.1 MWCapacity
WithdrawnStatus
WestMarket
HydroTechnology

Project facts

Canonical nameWest Queue Project 893 — Hydro in Jefferson, Oregon
Queue ID893
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologyHydro
Capacity1.1 MW
StateOregon
CountyJefferson
Point of interconnectionCircuit 5D5 out of Culver substation
Requested (queue) date2017-06-16
Proposed in-service date2017-12-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerPacifiCorp

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.