West Queue Project 895 — Hydro in Linn, Oregon

West Queue Project 895 — Hydro in Linn, Oregon is a 5.0 MW hydro interconnection project in Linn, Oregon with a current status of operational. It is proposed to connect at Circuit 4M94 out of Sweet Home substation.

5.0 MWCapacity
OperationalStatus
WestMarket
HydroTechnology

Project facts

Canonical nameWest Queue Project 895 — Hydro in Linn, Oregon
Queue ID895
Statusoperational
Source statusoperational
MarketWest
TechnologyHydro
Capacity5.0 MW
StateOregon
CountyLinn
Point of interconnectionCircuit 4M94 out of Sweet Home substation
Requested (queue) date2017-06-20
Proposed in-service date2020-01-01
Operational date
Withdrawn date
DeveloperFalls Creek HP, LP
Utility / transmission ownerPacifiCorp

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata