West Queue Project 900 — Solar in Douglas, Oregon

West Queue Project 900 — Solar in Douglas, Oregon is a 20.0 MW solar interconnection project in Douglas, Oregon with a current status of withdrawn. It is proposed to connect at Canyonville substation.

20.0 MWCapacity
WithdrawnStatus
WestMarket
SolarTechnology

Project facts

Canonical nameWest Queue Project 900 — Solar in Douglas, Oregon
Queue ID900
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologySolar
Capacity20.0 MW
StateOregon
CountyDouglas
Point of interconnectionCanyonville substation
Requested (queue) date2017-06-26
Proposed in-service date2018-06-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerPacifiCorp

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.