West Queue Project 94 — Wind in Gilliam, Oregon

West Queue Project 94 — Wind in Gilliam, Oregon is a 4.5 MW wind interconnection project in Gilliam, Oregon with a current status of withdrawn. It is proposed to connect at Arlington substation.

4.5 MWCapacity
WithdrawnStatus
WestMarket
WindTechnology

Project facts

Canonical nameWest Queue Project 94 — Wind in Gilliam, Oregon
Queue ID94
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologyWind
Capacity4.5 MW
StateOregon
CountyGilliam
Point of interconnectionArlington substation
Requested (queue) date2006-10-06
Proposed in-service date2007-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerPacifiCorp

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.