West Queue Project 984 — Solar in Polk, Oregon

West Queue Project 984 — Solar in Polk, Oregon is a 3.0 MW solar interconnection project in Polk, Oregon with a current status of withdrawn. It is proposed to connect at Circuit 4M238 out of Dallas substation.

3.0 MWCapacity
WithdrawnStatus
WestMarket
SolarTechnology

Project facts

Canonical nameWest Queue Project 984 — Solar in Polk, Oregon
Queue ID984
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologySolar
Capacity3.0 MW
StateOregon
CountyPolk
Point of interconnectionCircuit 4M238 out of Dallas substation
Requested (queue) date2017-11-29
Proposed in-service date2019-12-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerPacifiCorp

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata