West Bay - Centennial 138 kV (J2441)

West Bay - Centennial 138 kV is a 250.0 MW solar interconnection project in Beauregard, Louisiana with a current status of withdrawn. It is proposed to connect at West Bay - Centennial 138 kV.

250.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameWest Bay - Centennial 138 kV
Queue IDJ2441
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity250.0 MW
StateLouisiana
CountyBeauregard
Point of interconnectionWest Bay - Centennial 138 kV
Requested (queue) date2022-09-15
Proposed in-service date2026-10-31
Operational date2026-10-31
Withdrawn date2025-07-30
Developer
Utility / transmission ownerCleco Power LLC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.