West Queue Project BHBE G12 — Wind in Campbell, South Dakota
West Queue Project BHBE G12 — Wind in Campbell, South Dakota is a 300.0 MW wind interconnection project in Campbell, South Dakota with a current status of withdrawn. It is proposed to connect at Pumpkin Buttes - Windstar Tap.
300.0 MWCapacity
WithdrawnStatus
WestMarket
WindTechnology
Project facts
| Canonical name | West Queue Project BHBE G12 — Wind in Campbell, South Dakota |
|---|---|
| Queue ID | BHBE G12 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | West |
| Technology | Wind |
| Capacity | 300.0 MW |
| State | South Dakota |
| County | Campbell |
| Point of interconnection | Pumpkin Buttes - Windstar Tap |
| Requested (queue) date | 2017-07-05 |
| Proposed in-service date | 2023-12-31 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Black Hills Cheyenne Light Fuel and Power Transmission |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata