West Queue Project BHBE G15 — Solar in Meade, South Dakota

West Queue Project BHBE G15 — Solar in Meade, South Dakota is a 80.0 MW solar interconnection project in Meade, South Dakota with a current status of active. It is proposed to connect at Lange-Lookout Tap.

80.0 MWCapacity
ActiveStatus
WestMarket
SolarTechnology

Project facts

Canonical nameWest Queue Project BHBE G15 — Solar in Meade, South Dakota
Queue IDBHBE G15
Statusactive
Source statusactive
MarketWest
TechnologySolar
Capacity80.0 MW
StateSouth Dakota
CountyMeade
Point of interconnectionLange-Lookout Tap
Requested (queue) date2021-05-11
Proposed in-service date2024-01-11
Operational date
Withdrawn date
DeveloperVedauwoo Holdings Black Hills 1 LLC
Utility / transmission ownerBlack Hills Cheyenne Light Fuel and Power Transmission

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.