West Queue Project BHBE G20 — Solar in Dawes, South Dakota
West Queue Project BHBE G20 — Solar in Dawes, South Dakota is a 250.0 MW solar interconnection project in Dawes, South Dakota with a current status of active. It is proposed to connect at West Hills - Stegall 230 kV line.
250.0 MWCapacity
ActiveStatus
WestMarket
SolarTechnology
Project facts
| Canonical name | West Queue Project BHBE G20 — Solar in Dawes, South Dakota |
|---|---|
| Queue ID | BHBE G20 |
| Status | active |
| Source status | active |
| Market | West |
| Technology | Solar |
| Capacity | 250.0 MW |
| State | South Dakota |
| County | Dawes |
| Point of interconnection | West Hills - Stegall 230 kV line |
| Requested (queue) date | 2022-07-25 |
| Proposed in-service date | 2025-12-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Black Hills Cheyenne Light Fuel and Power Transmission |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata