West Queue Project BPA — Wind in Box Elder, Utah

West Queue Project BPA — Wind in Box Elder, Utah is a 95.0 MW wind interconnection project in Box Elder, Utah with a current status of unknown. It is proposed to connect at 138kV.

95.0 MWCapacity
UnknownStatus
WestMarket
WindTechnology

Project facts

Canonical nameWest Queue Project BPA — Wind in Box Elder, Utah
Queue IDBPA
Statusunknown
Source statusunknown
MarketWest
TechnologyWind
Capacity95.0 MW
StateUtah
CountyBox Elder
Point of interconnection138kV
Requested (queue) date2009-08-07
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerIdaho Power Company

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata