West Queue Project GI-0122 — Hydro in Liberty, Montana

West Queue Project GI-0122 — Hydro in Liberty, Montana is a 8.0 MW hydro interconnection project in Liberty, Montana with a current status of operational. It is proposed to connect at Tiber 115kV.

8.0 MWCapacity
OperationalStatus
WestMarket
HydroTechnology

Project facts

Canonical nameWest Queue Project GI-0122 — Hydro in Liberty, Montana
Queue IDGI-0122
Statusoperational
Source statusoperational
MarketWest
TechnologyHydro
Capacity8.0 MW
StateMontana
CountyLiberty
Point of interconnectionTiber 115kV
Requested (queue) date2001-12-03
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerWAPA/BEPC/HCPD Integrated System

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata