West Queue Project GI-0205 — Coal in Adams, North Dakota

West Queue Project GI-0205 — Coal in Adams, North Dakota is a 100.0 MW coal interconnection project in Adams, North Dakota with a current status of withdrawn. It is proposed to connect at Hettinger.

100.0 MWCapacity
WithdrawnStatus
WestMarket
CoalTechnology

Project facts

Canonical nameWest Queue Project GI-0205 — Coal in Adams, North Dakota
Queue IDGI-0205
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologyCoal
Capacity100.0 MW
StateNorth Dakota
CountyAdams
Point of interconnectionHettinger
Requested (queue) date2002-04-30
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerWAPA/BEPC/HCPD Integrated System

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata