West Queue Project GI-0301 — Diesel in Clay, Iowa

West Queue Project GI-0301 — Diesel in Clay, Iowa is a 5.4 MW diesel interconnection project in Clay, Iowa with a current status of operational. It is proposed to connect at Spencer.

5.4 MWCapacity
OperationalStatus
WestMarket
DieselTechnology

Project facts

Canonical nameWest Queue Project GI-0301 — Diesel in Clay, Iowa
Queue IDGI-0301
Statusoperational
Source statusoperational
MarketWest
TechnologyDiesel
Capacity5.4 MW
StateIowa
CountyClay
Point of interconnectionSpencer
Requested (queue) date2003-02-12
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerWAPA/BEPC/HCPD Integrated System

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.