West Queue Project GI-0325 — Coal in Custer, Montana

West Queue Project GI-0325 — Coal in Custer, Montana is a 500.0 MW coal interconnection project in Custer, Montana with a current status of withdrawn. It is proposed to connect at Rosebud.

500.0 MWCapacity
WithdrawnStatus
WestMarket
CoalTechnology

Project facts

Canonical nameWest Queue Project GI-0325 — Coal in Custer, Montana
Queue IDGI-0325
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologyCoal
Capacity500.0 MW
StateMontana
CountyCuster
Point of interconnectionRosebud
Requested (queue) date2003-10-08
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerWAPA/BEPC/HCPD Integrated System

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.