West Queue Project GI-0708 — Gas in Roosevelt, Montana

West Queue Project GI-0708 — Gas in Roosevelt, Montana is a 120.0 MW gas interconnection project in Roosevelt, Montana with a current status of operational. It is proposed to connect at Culbertson 115kV.

120.0 MWCapacity
OperationalStatus
WestMarket
GasTechnology

Project facts

Canonical nameWest Queue Project GI-0708 — Gas in Roosevelt, Montana
Queue IDGI-0708
Statusoperational
Source statusoperational
MarketWest
TechnologyGas
Capacity120.0 MW
StateMontana
CountyRoosevelt
Point of interconnectionCulbertson 115kV
Requested (queue) date2007-05-09
Proposed in-service date2010-06-15
Operational date
Withdrawn date
DeveloperBEPC
Utility / transmission ownerWAPA/BEPC/HCPD Integrated System

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata