West Queue Project GI-1107 — Gas in Divide, North Dakota

West Queue Project GI-1107 — Gas in Divide, North Dakota is a 2.0 MW gas interconnection project in Divide, North Dakota with a current status of withdrawn. It is proposed to connect at Williston 115kV.

2.0 MWCapacity
WithdrawnStatus
WestMarket
GasTechnology

Project facts

Canonical nameWest Queue Project GI-1107 — Gas in Divide, North Dakota
Queue IDGI-1107
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologyGas
Capacity2.0 MW
StateNorth Dakota
CountyDivide
Point of interconnectionWilliston 115kV
Requested (queue) date2011-11-23
Proposed in-service date2012-01-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerWAPA/BEPC/HCPD Integrated System

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata