West Queue Project GI-1212 — Wind in Mccone, Montana
West Queue Project GI-1212 — Wind in Mccone, Montana is a 75.0 MW wind interconnection project in Mccone, Montana with a current status of withdrawn. It is proposed to connect at Wolf Point-Circle 115kV.
75.0 MWCapacity
WithdrawnStatus
WestMarket
WindTechnology
Project facts
| Canonical name | West Queue Project GI-1212 — Wind in Mccone, Montana |
|---|---|
| Queue ID | GI-1212 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | West |
| Technology | Wind |
| Capacity | 75.0 MW |
| State | Montana |
| County | Mccone |
| Point of interconnection | Wolf Point-Circle 115kV |
| Requested (queue) date | 2012-08-28 |
| Proposed in-service date | 2016-09-30 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Sand Creek Wind |
| Utility / transmission owner | WAPA/BEPC/HCPD Integrated System |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata