West Queue Project GI-1412 — Wind in Billings, North Dakota

West Queue Project GI-1412 — Wind in Billings, North Dakota is a 201.0 MW wind interconnection project in Billings, North Dakota with a current status of withdrawn. It is proposed to connect at CC-Belfield 345kV.

201.0 MWCapacity
WithdrawnStatus
WestMarket
WindTechnology

Project facts

Canonical nameWest Queue Project GI-1412 — Wind in Billings, North Dakota
Queue IDGI-1412
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologyWind
Capacity201.0 MW
StateNorth Dakota
CountyBillings
Point of interconnectionCC-Belfield 345kV
Requested (queue) date2014-08-14
Proposed in-service date2017-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerWAPA/BEPC/HCPD Integrated System

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.