West Queue Project GI-2008-26 — Solar in Saguache, Colorado
West Queue Project GI-2008-26 — Solar in Saguache, Colorado is a 100.0 MW solar interconnection project in Saguache, Colorado with a current status of withdrawn. It is proposed to connect at San Luis-Poncha 230KV line.
100.0 MWCapacity
WithdrawnStatus
WestMarket
SolarTechnology
Project facts
| Canonical name | West Queue Project GI-2008-26 — Solar in Saguache, Colorado |
|---|---|
| Queue ID | GI-2008-26 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | West |
| Technology | Solar |
| Capacity | 100.0 MW |
| State | Colorado |
| County | Saguache |
| Point of interconnection | San Luis-Poncha 230KV line |
| Requested (queue) date | 2008-11-03 |
| Proposed in-service date | 2013-06-01 |
| Operational date | — |
| Withdrawn date | 2013-12-17 |
| Developer | — |
| Utility / transmission owner | Public Service Company Of Colorado |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata