West Queue Project GI-2011-3 — Solar in Alamosa, Colorado

West Queue Project GI-2011-3 — Solar in Alamosa, Colorado is a 60.0 MW solar interconnection project in Alamosa, Colorado with a current status of withdrawn. It is proposed to connect at 115 kV line between San Luis Valley and Alamosa Substation.

60.0 MWCapacity
WithdrawnStatus
WestMarket
SolarTechnology

Project facts

Canonical nameWest Queue Project GI-2011-3 — Solar in Alamosa, Colorado
Queue IDGI-2011-3
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologySolar
Capacity60.0 MW
StateColorado
CountyAlamosa
Point of interconnection115 kV line between San Luis Valley and Alamosa Substation
Requested (queue) date2011-03-22
Proposed in-service date2014-12-31
Operational date
Withdrawn date2012-01-05
Developer
Utility / transmission ownerPublic Service Company Of Colorado

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata