West Queue Project GI-2012-2 — Wind in Golden, Colorado
West Queue Project GI-2012-2 — Wind in Golden, Colorado is a 50.0 MW wind interconnection project in Golden, Colorado with a current status of withdrawn. It is proposed to connect at El Dorado Substation.
50.0 MWCapacity
WithdrawnStatus
WestMarket
WindTechnology
Project facts
| Canonical name | West Queue Project GI-2012-2 — Wind in Golden, Colorado |
|---|---|
| Queue ID | GI-2012-2 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | West |
| Technology | Wind |
| Capacity | 50.0 MW |
| State | Colorado |
| County | Golden |
| Point of interconnection | El Dorado Substation |
| Requested (queue) date | 2012-04-09 |
| Proposed in-service date | 2014-01-01 |
| Operational date | — |
| Withdrawn date | 2013-06-14 |
| Developer | — |
| Utility / transmission owner | Public Service Company Of Colorado |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata